Turnkey Automation Dual Filter Bed Automation Panel with Backwash PLC Panel for Level, Flow, Motor, Pump Monitoring and Control Remote Monitoring and Control Of Intake well OHTs and BPT s Motors Pumps and Valves Wireless Control of Clariflocculator Motor On RF Alum/Lime tank Level and Agitator control Filter Bed Level Monitoring For back wash operation Filter bed Soft control through HMI Clear water Rate of Flow monitoring at Rectangular Weir Open Channel Flow meter with Parshall Flume Design Supply And Installation Electromagnetic Flow meter Supply Installation and Commissioning along with RCC Chamber Intake Well ,CWR, OHT Pressure TX Supply Installation and Commissioning Online Chlorine, Turbidity and Ph Analyzer Supply Installation And Commissioning at WTP& ESR Ultrasonic Level Transmitter Installation and Commissioning at Intake ,WTP,OHT Remote Terminal RTU Panel Installation and Commissioning at BPT /OHT Manual And Automatic Chlorination System Testing Lab Development Monitoring station development Intake well, OHTs Monitoring and Pump controlling Inlet Outlet Motorizes valve for Controlling WTP, STP and Water Distribution Networks Datacenter for Centralized Monitoring and Controlling and Monitoring
PAST Errection and AMC Experience Highlights
World bank Project Uday Completion: 250 no. Flow meter Supply, installation and 5 year AMC after warranty period including 2000 MM Kolar Dam Flow meter installation commissioning and AMC.
JNNURM Bhopal Municipal Corporation : 78 no Level Transmitter supply installation commissioning with in Bhopal through various contractors.
BHEL BHOPAL 3 year Instrumentation AMC includes supply installation and commissioning of instruments.
BHEL Rampur site 300m vertical S.S pipe Errection ,installation Commissioning in surge shaft well along with Level transmitter installation .
Bhel Mangalechu site , Rewanda south Africa for Level instrument commissioning , Parbati 1 2 & 3 site level installation , Salma dam Flow meter commissioning Afganistan ,Kameng Arunachal Pradesh radar Installation and Commissioning at Surge well 100 m deep .
Idgah Hill Bhopal WTP Cable and cable trey installation and commissioning with earthing.
UADD MP betul site 2 wtp 2 intake and 9 OHT 100% earthing ,cable, conduit laying and errection along with 28 flow meter, 22 level ,15 chlorine 2 turbidity 1 Ph errection commissioning.